April 16, 2015

It was a taxing week.  I spent much of it in the engine room doing “boat yoga” to finish assessing the feasibility of the watermaker installation and prepare for the new battery system.  The rest was spent researching and ordering the new stuff, and referring to Nigel Calder’s Mechanical and Electrical Manual to make sure I do it right.  Since no good deed goes unpunished, the scope is not just creeping, but loping right along!  The good news:  the engine-driven watermaker will work and I’ve coerced a friend to help me with the necessary welding and metalwork.
The new battery system will have a house bank consisting of two Rolls S605 (L 16 size) batteries.  These will supply 468 amp hours (20 hour rating) at 12 volts and should last many years if properly maintained.   They weigh almost 130 lbs each, so getting them into place will be a challenge.  Fortunately, another friend, the dock gym rat, has agreed to heft them around.  The other “bank” will be a high capacity starting battery.  The best way to manage and charge such a system is with series charging regulation using something like the Xantrex Echo charger.  The present charging system using an isolator (diodes) will have to do initially until I can refill the cruising kitty.  If I find it can fully charge the batteries, however, it can stay.  I’m doubtful, but it’s possible.
Regardless, the wiring will have to be sorted out and re-configured, and I’ve taken the first steps in doing that.  I’m also preparing the engine room for the new battery configuration, which will be totally different:  much cleaner, more powerful and more durable.
The sailboat that sank last week was an old woody, but well loved and cared for.  Unfortunately, a plank separated at the stem and because the boat was not connected to shore power, the battery died eventually and without power for the bilge pump, the boat went down.  Sadly, it will be totaled.
























April 9, 2015

The final step in the completion of my “mini home theatre” was getting the wedge pillow upholstered using the same fabric as the berths and settee.  That was done very well at a good price by an upholsterer around the corner from Carol in L.A.  I also took care of a couple of other minor, but nagging, little projects this week:  replacing missing baseboard in the galley and re-installing the hasps for locking the cockpit lazarettes.
Spurred on by the growing water crisis in California, I spent quite a bit of time researching watermakers and assessing the feasibility of installing one on Circadian.  I've settled on an engine-driven SeaMaker kit from Cruise RO Water and started doing my pre-purchase/pre-installation due diligence.   That included lots of measurements, study of detailed engineering drawings and finally building and testing a model.  The model trial revealed some issues that mean I’ll need to revamp my house battery installation and try again with a slightly modified model. 
All that has shifted my overall focus to the engine room and some nagging “list” items there.   In addition to re-doing the batteries, I need to improve the primary wiring and install a second high-capacity bilge pump. (Not that the sinking of a boat in a nearby slip this week had anything to do with my new priorities!)  Should keep me busy for quite some time….


















April 2, 2015

Thanks to good weather, I was able to apply multiple coats of Epifanes RapidCoat to the overhead trim pieces and complete the trim installation this week.  Huge improvement, but of course it makes the unfinished areas of the cabin look worse.  Not sure what’s next.  With the looming water crisis in California, I’m giving very serious thought to installing a watermaker, which could be a nice addition regardless.  That would mean digging into engine room projects…. I still want to get out sailing too.  But it may be a couple of more weeks at least before enough novice steersmen/women are developed in the outrigger club to allow me to take off for a while.   We’ll see….