skip to main |
skip to sidebar
Accomplishments of 2013
- Completed aft head restoration/upgrade
- Re-certified fire extinguishers
- Refinished exterior teak trim on pilot house
- Completed restoration/upgrade of aft cabin
- Had new cushions made for quarter berths
- Miscellaneous maintenance and repairs
- Refinished all teak in the doghouse and cockpit
- Restored breaker panel in cockpit
- Added new liner inside doghouse
- Put a new overhead in doghouse
- Had full canvas cockpit enclosure and screens made
- Built a new teak cockpit table
- Replaced Morse throttle/shift lever assembly
- Installed new stainless steel cleats for jib sheets
- Restored louvered engine room vents
- Rewired solar panels and gps antenna
- Added new ground busbar for cockpit breaker panel
- Installed new 110 vac circuit
- Epoxied and painted dinghy oars and made new leathers and stops
- Painted cockpit sole and wheel rim
- Installed beaching wheels on dinghy
- Repaired and upgraded sun awning
- Installed a magnesium anode in hot water heater
- Restored and refinished teak cockpit seats
- Installed two more new ABI bronze ports
- Made teak chocks to hold cast stainless Danforth anchor and installed them on cabin top
- Refinished interior teak trim for main cabin skylights and companionway
- Installed new wiring for main cabin overhead lighting
- Refinished some galley counter trim
- Rebedded aft cabin port light
- Installed first main cabin overhead panels and LED lights
No comments:
Post a Comment