Accomplishments of 2013



  • Completed aft head restoration/upgrade
  • Re-certified fire extinguishers
  • Refinished exterior teak trim on pilot house
  • Replaced freshwater pump
  • Completed restoration/upgrade of aft cabin
  • Had new cushions made for quarter berths 
  • Miscellaneous maintenance and repairs
  • Refinished all teak in the doghouse and cockpit
  • Restored breaker panel in cockpit
  • Added new liner inside doghouse 
  • Put a new overhead in doghouse
  • Had full canvas cockpit enclosure and screens made
  • Built a new teak cockpit table
  • Replaced Morse throttle/shift lever assembly
  • Installed new stainless steel cleats for jib sheets
  • Restored louvered engine room vents
  • Rewired solar panels and gps antenna
  • Added new ground busbar for cockpit breaker panel
  • Installed new 110 vac circuit
  • Tuned rig
  • Epoxied and painted dinghy oars and made new leathers and stops
  • Painted dorade vents
  • Painted cockpit sole and wheel rim
  • Installed beaching wheels on dinghy
  • Repaired and upgraded sun awning
  • Installed a magnesium anode in hot water heater
  • Restored and refinished teak cockpit seats
  • Installed two more new ABI bronze ports
  • Made teak chocks to hold cast stainless Danforth anchor and installed them on cabin top
  • Refinished interior teak trim for main cabin skylights and companionway
  • Installed new wiring for main cabin overhead lighting 
  • Refinished some galley counter trim
  • Rebedded aft cabin port light
  • Installed smoke detector
  • Installed first main cabin overhead panels and LED lights



No comments:

Post a Comment