I've added some more photos (taken with film cameras) to last week's cruise post, so take a look.  This week started with tackling the list of projects developed during the cruise:
   - Make wire rope dinghy bridles
   - Secure the engine exhaust loop with thru-bolts
   - Install a handle on the aft lazarette hatch
   - Replace the shower sump pump
   - Install anti-rattle pads on head and forward cabin doors
   - Flush the outboard and run the fuel out of the carburetor
   - Find out why the autopilot is beeping
   - Move the spare anchor to the bilge
   - Replace the chain stopper
   - Repair the broken shelf on the refrigerator door

I completed all of them with exception of the anti-rattle pads and the chain stopper.  Checking those off is just a matter of getting the items.

With the new list essentially handled, it was back to work on the aft cabin.  I recovered the long oak boards from their temporary shelter in John's storage unit and literally started back into the grind.  It's a lot of work, but as it progresses, I can see it's really going to look nice!

 



















































August 23, 2012

I've always been one who eats to live rather than lives to eat, so it was a bit of a revelation at Carol's birthday dinner last week to find that gluttony can have a certain appeal.  Needless to say, the Maine lobster and its accoutrements more than lived up to prior billing. Unfortunately, the next morning I had to waddle back home to get the boat ready for our cruise to the Channel Islands.
The only construction project this week was the fabrication of new fiddles for the shelves in the v-berth (as part of the effort to make sure everything was properly secured for sea).  Most of my time was spent trying to tick off as many as possible of the 37 items on the pre-departure list: checking, stowing, cleaning, and buying.  I spent four hours with a pressure washer blasting off 8 months of accumulated grunge and another four hours sucking up bilge water with a shop vac, just to give you an idea of what a glamorous week it's been.  I also replaced the broken switch for the new light in the aft quarter berth, and, thanks to John, replaced the rather dubious bridles used to support the dinghy in its davits.  Most of the equipment checks went well, with the exception of the autopilot.  Although it had run perfectly three days ago, it was totally dead today.  Some sleuthing with the volt meter led to the discovery of a loose ground connection on the breaker panel, a thankfully easy fix.  I still have a lot to do, but enough will get done so that we can leave on Sunday.  Since we'll be away from internet access, next week's post will not happen until we're back on the following Sunday or Monday.